Rail

CHOO CHOOO!!! Want to get on board with Witt's rail engineering services?

With both our TAO accreditation and ARTC certifications, our involvement on rail projects spans far and wide, we provide design reviews of temporary and permanent structures to rail operators.

Inland Rail - Narrabri to North Star

The Narrabri to North Star (N2NS) Project was one of 13 individual projects making up the larger ARTC project called Inland Rail. The rail tracks will be used by freight trains between Brisbane and Melbourne.
N2NS consisted of upgrading 184 km of an existing rail corridor and construction of 2 km of new tracks to accommodate for the 1,800 m-long double-stacked freight trains. This upgrade and construction crossed three LGA’s, being Gwydir, Narrabri and Moree Plains.

Our Witt engineers performed a structural assessment of the steel bridge underneath the TLO bin at Narrabri Coal Mine and Proof engineering reviews on designs for level crossings

Principal: NSW Rail Services | Contractor: Trans4m Rail and JH Rail Pty Ltd | Completion: 2024

Werris Creek Gap Bridge Replacement

The project proposed and has successfully replaced the life-expired steel rail bridge at Werris Creek and delivered a new concrete ballast top structure, improving the safety and reliability of the bridge for future operations. Witt Consulting performed a preliminary site inspection and developed a concept arrangement of working platform and ramp for the installation of the piles for the underbridge replacement.

Principal: NSW Rail Services | Contractor: John Holland Rail Pty Ltd | Completion: 2024

Close up shot of rail track on Botany Rail Duplication

Botany Rail Duplication

Witt Consulting provided end-to-end engineering services for a comprehensive range of temporary works, significantly contributing to construction efficiency and safety within this critical rail infrastructure project.

Parramatta Light Rail – Stage 2

Parramatta Light Rail Stage 2 is being delivered in phases, beginning with the Enabling Works package. This initial stage comprises approximately 1.3 kilometres of new light rail alignment, including the construction of a public and active transport bridge over the Parramatta River connecting Wentworth Point and Melrose Park.

Parramatta Light Rail